Results for “lockheedmartin”

GOES-T Satellite at Processing Facility
NOAASatellites · 683×1024

GOES-T at Astrotech Satellite Processing Facility
NOAASatellites · 1024×683

GOES-S Antenna Wing Assembly Deployment
NOAASatellites · 1024×769

GOES-R SUVI Guide Telescope
NOAASatellites · 500×375

Fully Integrated GOES-S Satellite
NOAASatellites · 1024×867

GOES-T Satellite with Solar Array Deployed
NOAASatellites · 1024×683

Bestof, environmentaltesting, goesr
NOAASatellites · 1024×683

GOES-R GLM Sensor Electronics Box Installed
NOAASatellites · 500×372

Friction welding at CAHRF
DanielC743 · 1024×683

Assembled and Integrated GOES-R Satellite
NOAASatellites · 1024×683

SUVI Installed on GOES-R Satellite
NOAASatellites · 1024×680

GOES-R Satellite Lifted for Transport to Thermal Vacuum Chamber
NOAASatellites · 375×500

GOES-R Satellite Transported for Environmental Testing
NOAASatellites · 1024×765

GOES-S satellite in thermal vacuum testing
NASA/GSFC · 1280×853

Preparing to Lower the GOES-R Satellite into Thermal Vacuum Chamber
NOAASatellites · 1024×768

GOES-R GLM Sensor Unit Completes Thermal Vacuum Testing
NOAASatellites · 374×500

GOES-R Satellite Lowered into Thermal Vacuum Chamber
NOAASatellites · 1024×771

GOES-R GLM Sensor Unit Prepares for Thermal Vacuum Testing
NOAASatellites · 500×378

GOES-R Fully Assembled Satellite
NOAASatellites · 1024×683

GOES-R GLM Sensor Unit Prior to Thermal Vacuum Testing
NOAASatellites · 1024×683

Orion PV3 Closeout Weld
DanielC743 · 1024×683

GOES-S Satellite Instruments Integrated
NOAASatellites · 1024×768

Friction welding
DanielC743 · 1024×576

GOES-T Satellite Processing Team at Astrotech
NOAASatellites · 683×1024

GOES-R Satellite Returned to Clean Room after Thermal Vacuum Testing
NOAASatellites · 577×1024